Macadam strip replaced 20.10.12
Turf pitch waterlogged- levelling to be postponed until dryer weather/ seeding destoning to take place in spring
Ditto
Steps to prep school area complete. MST still to forward details for comment
Area adjacent steps to be graded
Timber crib wall- awaiting guarding above
AWP fence posts now installed. Panels to follow shockpad./ carpet installation
Crib wall/ steps
Macadam removed where level over kerb
Car park setting out adjusted- MST to mark up drawing to describe loss of bays