Friday, 9 September 2011

Site visit 110908


Maintenance depot- road will need to be diverted from left to right side of building in current scheme


hedge adjacent crinkle- crankle wall of pre-prep to be removed


Edge of AWP will extend adjacent existing football pitch- not currently overlai


Existing drain- feeds from maintenance yard, drains from pitch and feed from Middleton Hall Lane ditch


Pitch drain


Electrical feed runs under Middleton Hall lane


Road will need to be located to other side of maintenance building- where fencing located


Current road position


Rear maintenance yard


location of proposed car park- climbing frame to be relocated


Entrance to maintenance depot


Area for proposed path from Bayman gate to Prep


Existing power supply adjacent crossing


Area for proposed path between Bayman gate and Pre-prep